Documentation

The 7-Step Checklist I Use Before Ordering Any Medical Equipment

2026-11-06 · Kenji Mori

A practical buying process for office administrators who order wheelchairs, laparoscopes, ostomy supplies, and other clinical equipment—without a clinical background.

Medical device documentation desk

Who this checklist is for

I'm the office administrator for a 350-person clinic network. Since 2020, I've managed roughly $1.8 million in annual medical equipment spending across a dozen vendors. I have no clinical training. My background is business administration, and my first week on the job involved a stack of catalogs and a vague instruction to "order what the departments need."

If you've been handed a purchasing login and a similar instruction, this is for you. Here's the seven-step checklist I run through before I send any purchase order.

Before you roll your eyes at "seven steps"—I know. It sounds like a lot. But I've paid for these lessons in restocking fees and 2 a.m. emails, so I'm writing them down.

Step 1: Write down the clinical requirement, not just the product name

When a department asks for "a wheelchair," that's not a requirement. It's a category. The first time I got a request like that, I ordered a standard manual wheelchair and it was wrong—the patient needed a tilt-in-space configuration. If I remember correctly, the restocking fee was around $350. Maybe $375. Either way, the chair went back on a pallet and I had to explain to finance why we'd spent money to receive nothing.

Before I place any order now, I ask three questions:

  • Who is the end user, and what's their weight, height, and mobility level?
  • Where will this be used—exam room, patient room, transport, home care?
  • Is there a model the clinical team has used before and liked?

The last question matters more than you'd think. When we first ordered physiotherapy equipment, I typed "what is physiotherapy" into a search bar because I genuinely didn't know whether that meant ultrasound machines or exercise bands. It's both, depending on the setting. But the department already had a brand they trusted. I could've saved myself a week of research just by asking first.

Step 2: Confirm the exact model and configuration

"Permobil manual wheelchair" isn't a model. It's a manufacturer and a category. Permobil makes several manual wheelchair lines, with different seat widths, weight capacities, and frame options. If you order the wrong configuration, you'll find out when it arrives.

I learned this the hard way in 2022. I ordered a laparoscope based on a two-line email that said "we need the standard one." Turns out there were three "standard" configurations depending on the procedure type. The one I ordered did not match the one the surgeon needed. That was a $2,000 mistake—not counting the rescheduled procedures.

Now I ask for the exact model number in writing. If the department doesn't know it, I send them the product page and ask them to confirm. I know—it feels like overkill. It's not. Fifteen minutes of confirming saves you three weeks of unwinding the error.

Step 3: Get a total-cost quote, not a unit price

Here's where I annoy vendors. I ask for a quote that includes shipping, installation, training, warranty terms, and the cost of a service contract if one is available. A cheaper unit price often means a higher total cost.

I once chose a vendor because their quote was $200 lower than the alternative. Then I found out the $200 didn't include delivery—and delivery was $350. Net loss: $150 on a decision I thought was saving money. I'd been comparing unit prices, not total costs. Those are different numbers.

My rule now: if the quote doesn't list what's included and what's excluded, it's not a quote. It's a starting point for a conversation.

Step 4: Put hands on the documentation and support package

This is the step most people skip. I know I did for the first two years.

Before ordering, I ask the vendor for three things: the service manual, the error code list (if applicable), and the name of the service rep who will answer the phone when something breaks. If they hesitate on any of these, that tells me more about their support than their sales pitch does.

Two years ago we bought a Permobil M3 for a long-term care resident. The unit was fine, but when it started flashing error codes, the first thing I did was pull out the manual the vendor had sent with the order. The error code table told us it was a simple battery issue—something the in-house maintenance team could handle in about twenty minutes. If we hadn't had the documentation, I would've booked a service call (and paid for it) for something we fixed with a ten-minute read.

People assume expensive vendors give better support. I'm not sure that's the direction the causal arrow runs. Vendors who invest in documentation and field support have higher operating costs, which is partly why they cost more. The support doesn't come free with the price—the price reflects it. At least, that's been my experience in clinic purchasing.

Step 5: Check regulatory status and compatibility

I'm not qualified to interpret FDA regulations. Put another way: I'm the person who asks the vendor for the clearance number, not the person who decides whether the clearance is valid.

The FDA maintains a searchable 510(k) database at fda.gov for anyone to verify clearance status. If a vendor can't point you to a clearance number or a European equivalent (CE mark under MDR 2017/745), that's a red flag. Ask them to send it in writing.

For consumables—ostomy supplies, for instance—the questions are different. You're not checking clearance; you're checking compatibility with the products patients are already using. Ostomy supplies are not interchangeable across brands without input from the clinical team. I've seen a well-meaning buyer order "the same thing but cheaper" and end up with a product that didn't fit the existing wafers. The department had to use up the old stock first, and the "savings" sat on a shelf for four months.

Step 6: Run a small test order first

If a vendor is new to us, I don't place the full order. I order one or two units. It costs more per unit, but it tells me whether the packaging arrives intact, whether the invoice matches the quote, and whether the delivery date holds.

I skipped this step once because I was busy and the vendor had good references. The full order arrived three weeks late, in two batches, with one unit missing a power cord. It got sorted out, but I spent a week on it. That week was worth more than the money I thought I was saving by skipping the test order.

Step 7: Build a receiving check and a feedback loop

When the equipment arrives, someone has to check it against the order—not just "does it turn on," but "does it match the model number, the accessories, and the paperwork." I built a one-page receiving form that the warehouse team fills out for every delivery. If anything is off, we photograph it and notify the vendor within 24 hours.

That form is the least glamorous part of this process and the one that's saved us the most money. In 2023, it caught a substitution—a vendor sent a different model than we ordered and hoped we wouldn't notice. We noticed. We returned it and got the correct unit without paying a restocking fee.

The feedback loop matters too. Every month, I send department heads a short note: "Was this equipment what you needed? Any issues?" I don't always get replies, but when I do, it prevents the same mistake on the next order.

A few things I wish someone had told me earlier

Don't trust a verbal promise that "it will be fine." I had a vendor assure me over the phone that the delivery date was locked. It was not locked. Three weeks later I was explaining to my VP why the equipment wasn't there. Get it in writing—even if the rep is nice, even if you've worked with them for years. I thought we had a good enough relationship to skip the confirmation. That was the one time the verbal agreement got forgotten.

Don't assume the cheapest option is the same thing as the expensive one. Sometimes it is. Sometimes it isn't. Spend twenty minutes comparing specs and ten minutes reading the fine print. It's cheaper than finding out the hard way.

And keep your own records. I have a spreadsheet with every equipment order since 2020—model, vendor, price, delivery date, and any issue. When someone asks "what did we pay for this last time," I can answer in thirty seconds. When a vendor tells me the price hasn't changed, I can check.

The bottom line: if you're not a clinician, that's fine. Your job isn't to make clinical decisions. Your job is to make sure the clinical decision shows up correctly on a purchase order. These seven steps help me do that. Most of them, I learned the hard way.

Kenji Mori

Kenji Mori

Kenji Mori is a patient-monitoring and connected-care analyst specializing in multiparameter bedside monitors, ECG systems, pulse oximeters, telemetry, vital-sign stations, wearable sensors, and central monitoring platforms. He references IEC 80601-2-49 while evaluating measurement accuracy, alarm limits, signal dropout, sampling behavior, battery endurance, network latency, cybersecurity controls, data export, and electrode or sensor compatibility. His work helps acute-care teams, biomedical engineers, informatics leaders, and buyers assess surveillance reliability, alarm burden, interoperability, mobility, and deployment scale.